2018 Full Depth Reclamation Project

This year’s Full Depth Reclamation Project will address three street segments to overlay the pavement, including portions of Crossbrook Drive, Tharp Drive, and Ascot Drive. Past projects funded by Measure K have repaired our streets in the last few years:

  • Phase I repairs included localized patches, crack sealing, asphalt rubber cape seal, microsurfacing, and refreshing striping in 2013.
  • Phase II in 2014 addressed streets in poor condition that will need rehabilitation.
  • Phase III in 2015 and 2016 reconstructed streets in very poor condition that needed reconstruction.