This year’s Full Depth Reclamation Project will address three street segments to overlay the pavement, including portions of Crossbrook Drive, Tharp Drive, and Ascot Drive. Past projects funded by Measure K have repaired our streets in the last few years:
- Phase I repairs included localized patches, crack sealing, asphalt rubber cape seal, microsurfacing, and refreshing striping in 2013.
- Phase II in 2014 addressed streets in poor condition that will need rehabilitation.
- Phase III in 2015 and 2016 reconstructed streets in very poor condition that needed reconstruction.