PG&E
Campolindo Neighborhood Gas Main Replacement
Project Background
This job is designed to improve gas flow, reduce leaks, and ensure a reliable gas supply for the area, supporting community growth and infrastructure reliability. The project involves installing a new gas distribution main and service along Calle La Montana, Calle La Mesa, Paseo Del Rio and its surrounding areas.
Project Description
PG&E will be installing new gas mains along Calle La Montana, Corte Aires, Corte De Oro, Corte Del Caballo, Calle La Mesa, Corte Pinion, Via Granada, Corte Del Sol, Quintas Lane, Paseo Del Rio, and Corte Royal. These improvements will enhance gas supply reliability for the community.
This project includes excavating into the road and sidewalks to install the new gas mainlines and transfer service laterals to the new main, repaving sections of the roadway impacted by excavation, and slurry sealing the entire roadway of the project area.
You can expect to see the following work activities over the course of this project:
- Potholing to identify the depths of other utility lines that cross the path of the new gas main.
- Installing gas mains and gas laterals via open trenching or boring (the method is determined by field conditions).
- Restoring sidewalks, driveway, and/or landscaping restoration as necessary upon completion of the gas lateral installation.
- Repaving the areas excavated within the roadway.
- Micro surfacing the entire roadway (from gutter to gutter) for the project area.
Schedule*
| Phase | Timeline |
|---|---|
Gas Main Replacement: Paseo Del Rio/Corte Royal/Calle La Mesa/Quintas Lane | July 2025 – September 2025 |
Gas Main Replacement: Quintas Lane/Via Granada/Corte Del Sol | September 2025 – October 2025 |
Gas Main Replacement: Quintas Lane/Calle La Mesa/Corte Pinion | October 2025 – December 2025 |
Gas Main Replacement: Calle La Montana/Corte Del Caballo | December 2025 – January 2026 |
Gas Main Replacement: Calle La Montana | January 2026 – February 2026 |
Gas Main Replacement: Calle La Montana/Corte De Oro/Corte Aires | February 2026 – March 2026 |
Pavement/Concrete Restoration: Project-wide | March 2026 – April 2026 |
*Schedule is subject to change.
Community Engagement
PG&E aims to foster a sense of community involvement throughout the project. Residents can stay informed through automated phone calls from PG&E, strategically placed project signs at key locations, and contacting PG&E's public outreach representative (information below).
Project Contact Information
PG&E Contact: Maribel Palomino
Email: M0PZ@pge.com
Phone: (925) 204-4786